A 50mm wide damp proof course must be nailed to the batten where the batten contacts
the wall framing. |
|
40mm
wide cavity battons offset from building edge 100mm. |
|
|
|
d |
|
d |
Installation
of flashings were cladding meets stonework and around power box - Note batton
offset 100mm |
|
Flashing
at corner junction |
|
|
|
d |
|
d |
Cross
section of cavity showing the stainless tie fastened to the timber frame. |
|
Stud
centre lines must be clearly marked to allow for accurate positioning and cutting
of the holes required to enable the installation of the masonry ties back onto
the wall framing studs. This can be achieved by using a chalk string |
|
|
|
d |
This
image shows the breather / ventilation gap at top of the backing board |
|
The